Japanese contractor Shimizu Corporation has completed an investment in Noble Machines, a Silicon Valley startup, and started a full collaboration with it to develop humanoid robots for construction sites. The goal is robots that can support or take over physically demanding and hazardous work. The size of the investment has not been disclosed.
Japan’s ACIMUS Raises About ¥65 Million for a Chat-Based BIM Tool and Partners With JR East
CADCraft, a Free AutoCAD-Style Drafting App Written in Rust, Was Built Around AI Coding Agents
Blueprints AI Claims It Can Turn Sketches Into Permit-Ready Construction Drawings in Minutes
Robots Braid Hemp Rope Into Mould-Free Building Panels Bound by Living FungusNoble Machines, based in Sunnyvale, California, develops the MOBY series of humanoid robots for construction along with their operating systems, control technology and application software. It was founded in May 2024 and is led by chief executive Wei Ding. The Robot Report, covering the company’s launch earlier this year, said its first robot, Moby, can lift up to 60 lb (27 kg).

How Shimizu plans to test humanoid robots
Shimizu will feed its construction knowledge and site experience into Noble Machines’ hardware, control systems and applications. By the end of this year it plans to begin virtual simulations, built with its BIM and CIM data, of a first set of tasks: moving materials and equipment, finding a way around the site and carrying out patrols. Trials with physical robots on real construction sites are due to start next spring.

Why a contractor is investing in robots
Shimizu links the project to the supply of labour. It expects shortages as the workforce ages and fewer young people join the industry, and says meeting future demand with a smaller workforce will need closer cooperation between people and robots on site, on top of productivity gains at every stage of construction.

For design teams, the notable detail is the order of work: the robots are to rehearse site tasks in simulations built from Shimizu’s building and civil information models before they reach a real project. The release does not say which projects or models will be used.
Leave a comment