GROUP A strips a 1969 port headquarters in Rotterdam back to its frame, adds a floor it could already carry, and cuts terraces into the south face, saving roughly 75 percent of the carbon of a new build.

Share
Ferro Offices by GROUP A beside the harbour chimney in Rotterdam's M4H district
The building beside the harbour chimney. Photograph: Sebastian van Damme.
Share

Ferro Offices occupies a 1969 industrial headquarters in Merwe-Vierhavens, the Rotterdam harbour district usually shortened to M4H, and GROUP A’s work on it for the Port of Rotterdam is less a renovation than a demonstration. The building was stripped until only the structural frame was left, and everything after that was decided by what the frame could already do.

Presentation board cover for Ferro Offices by GROUP A, with the lead image, project summary and a grid of photographs and drawings
Presentation board: learnarchitecture. Project: Ferro Offices by GROUP A; Photography: Sebastian van Damme

The tenants are companies working on the energy transition, on new mobility and on circularity, which makes the building’s own arithmetic part of the brief. Keeping the existing structure cut the carbon of the project by roughly 75 percent against demolishing and rebuilding. That figure is the argument, and the rest of the design is spent making a stripped 1960s office frame worth occupying.

Ferro Offices by GROUP A beside the harbour chimney in Rotterdam's M4H district

What the frame allowed

Because the original structure had capacity in reserve, an extra floor could be added without the heavy material interventions that usually make vertical extensions expensive in both money and carbon. On the south side the facade was pulled back to open terraces along the office floors, which does two things at once: it gives outdoor space, a rarity in an office building, and it shades the glazing behind it.

At the centre, a new atrium and the stair sculpted into it open the plan from inside and pull daylight down into the depth of the floorplate. It also gives the building a front door facing Ferro Square, which reorients a structure that had been addressing the port rather than the city.

The parts worth keeping

Two elements of the 1969 building were restored rather than replaced, and both are the sort of thing a full rebuild would have lost without anyone noticing: the facade of glass blocks, and the great stone staircase with its timber handrails. They sit inside the new work as evidence, and they are also simply better than what would have replaced them.

The restored natural stone staircase and wooden handrail at Ferro Offices

At ground level the programme is deliberately public. A maker space two storeys high takes production work; bicycle parking indoors makes the low-carbon commute the convenient one; and around the central stair a plinth holds a cafe, tables to eat lunch at and seating on steps. It is the part of the building where the maritime companies upstairs actually meet each other.

Measured, not asserted

The environmental performance is specified rather than claimed. The facade is built from bio-based material, and the timber louvers on it cut solar gain and reduce the demand for mechanical cooling. The building runs entirely without gas, carries solar panels, meets the Dutch BENG standard, holds an A++++ energy label and has been certified BREEAM-NL Outstanding.

Second presentation board sheet for Ferro Offices by GROUP A, laying out the project drawings and images on one page
Presentation board: learnarchitecture. Project: Ferro Offices by GROUP A; Photography: Sebastian van Damme

All of it sits inside a larger change. the municipality and the port authority are remaking M4H and RDM Rotterdam into the Rotterdam Makers District, a working quarter for living, working, learning and innovation built together with businesses, students and research institutions. Ferro Offices is the version of that argument you can walk into: an industrial building kept, adapted and handed to the next economy of the port.

Share
Written by
LA Editorial Team

The Learn Architecture editorial team is a group of architects, designers, and writers who research, write, and review content on architecture, design, technology, sustainability, and education for students and professionals worldwide.

Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Articles
Brick lattice hospital tower behind lawn and trees, with a figure pushing a wheelchair in the foreground
MedicalProjects

Healing Tower by Tanbir Mahmud Chowdhury

Tanbir Mahmud Chowdhury's thesis for Pabna, Bangladesh, stacks a 250-bed general hospital...

Glowing glazed veranda between two tiled roof volumes at dusk, lawn in front, Scarlet House by Frederico Zanelato Arquitetos
ResidentialProjects

Scarlet House by Frederico Zanelato Arquitetos

Frederico Zanelato Arquitetos organise a 387 square metre holiday house in Porto...

Low concrete house with full height glazing set into coastal grasses, the ocean and a roof frame behind, Otway Beach House
ResidentialProjects

Otway Beach House by Kerstin Thompson Architects

Kerstin Thompson Architects turn a flame zone rating into the design of...

Aerial view of the timber framed cube on steel pilotis on a forested slope, Rouxinol House by Sergio Sampaio Archi + Tectônica
ResidentialProjects

Rouxinol House by Sergio Sampaio Archi + Tectônica

Sergio Sampaio Archi + Tectônica stack a glulam timber house on steel...

Learn Architecture is a global architecture learning platform and marketplace for content creators.

Subscribe to Our Updates

Enjoy a daily dose of architectural projects, tips, hacks, free downloadble contents and more.

Copyright © Learn Architecture Online. All rights reserved.
Made with ❤️ by learnarchitecture.online

iA Media's Family of Brands